Project Delivery  ·  Multi-Industry

An operator's experience.
A system that never blinks.
On your project.

I'm Keenan Lum. I've spent eight years in the field on fiber, telecom, and IoT builds, and I know where projects break because I've been there when they did. I run your project on a command center I built from that experience, so the plan and the ground truth are never more than a click apart.

For anyone running complex infrastructure builds.

FTTH/GPON HFC/Node Split 5G Backhaul IoT Connectivity OSP/Middle Mile SaaS Operations
VPG Mission Control — Sample Project
SAMPLE
Your Project
FTTH/GPON · Construction
Projects
FTTH Build — Phase 2
Anderson HFC Split
Regional IoT Rollout
Rusk OSP Route 7
Health
 2 On Track
 1 At Risk
 1 Critical
Health Score
74
↓ from 82
Active Risks
3
2 critical
Open Actions
8
3 overdue
Go-Live
42d
Jun 5
CriticalTxDOT permit FM 1234 — 14 days past deadline
HighSplice enclosure install — 39% with 42d to go-live
ResolvedOncor make-ready Zone 2 complete
Priority
Escalate TxDOT FM 1234 to the District Utility Coordinator today — the 14-day delay is direct go-live exposure. Next: recover splice enclosure pace to hold the June 5 date.
Project Completion72%
Active Tasks — Sample FTTH Build
18 open · 3 overdue · 7 completed this week
TxDOT Encroachment Permit — FM 1234
Submitted Apr 4 · 14 days overdue · Owner: PM Keenan
OVERDUE
811 Utility Locate — Section 4 FM 1234
Due Apr 28 · Pending clearance
BLOCKED
Splice Enclosure Install — Zone 3 (487 of 1,240)
In progress · Due May 15 · 39% complete
IN PROGRESS
Oncor Make-Ready — Zone 2 Aerial Complete
Completed Apr 18 · Strand authorized · 2.4 miles
COMPLETE
HDD Bore — Hwy 69 Crossing (320ft)
In progress · Due Apr 30 · Bore crew on site
IN PROGRESS
Contract
$4.2M
Spent
$2.8M
Remaining
$1.4M
Change Orders
+$142K
Budget vs Spend by Category
Aerial/Strand
$820K / $1.0M
Underground
$650K / $1.0M
Electronics
$910K / $1.0M
Make-Ready
$308K / $700K
Permitting
$76K / $200K
Recent Change Orders
CO-007  HDD rock encountered — Hwy 69+$48,000
CO-008  Oncor MR scope expansion — Zone 3+$31,200
CO-009  Aerial route optimization credit-$12,500
Location Tracker — Sample Build
487 of 1,240 certified · Draw eligible at 100%
284
Identified
312
Surveyed
157
In Progress
487
Certified
Address
Type
Status
Updated
1424 Rusk Hwy, Jacksonville
Residential
Certified
Apr 22
891 County Rd 413, Alto
Residential
In Progress
Apr 24
2201 S Jackson St
Business
Surveyed
Apr 19
FM 2138 Mile Marker 4.2
Anchor
Certified
Apr 21
What's our biggest risk to the June 5 go-live?
The TxDOT encroachment permit on FM 1234 is your critical-path risk — 14 days past deadline. If unresolved this week it pushes boring 3+ weeks, directly threatening June 5. Escalate to the TxDOT District 11 Utility Coordinator. Splice enclosure pace at 39% also needs attention to hold the date.
Generate the weekly status report
Generating Weekly Status Report...|
Ask anything about your project...
FTTH/GPON
Full Build Management
HFC
Node Split Management
5G Backhaul
Site Acquisition Tracking
IoT
Connectivity Deployments
OSP
Route & Permit Command
SaaS Ops
Cross-Functional Delivery
Daily Briefing
What Needs You Today
Client-Ready Reports
From Live Data
FTTH/GPON
Full Build Management
HFC
Node Split Management
5G Backhaul
Site Acquisition Tracking
IoT
Connectivity Deployments
OSP
Route & Permit Command
SaaS Ops
Cross-Functional Delivery
Daily Briefing
What Needs You Today
Client-Ready Reports
From Live Data
The Platform

Complex builds are unforgiving.
The gap between plan and field
is where they break.

The schedule says the permit's in. The field says the crew's been idle nine days. The invoice says one thing, the production log says another. Generic tools can't see those gaps — they don't know what a TxDOT permit, an 811 locate window, or an Oncor make-ready even is.

I built VPG Mission Control from the field up, across fiber, telecom, and IoT work. Every feature, alert, and report exists because of a real problem on a real build. It isn't software I'm selling you. It's the command center I run your project on.

Daily
Briefing on what needs you
Live
Schedule, risk & money in one place
Same-day
Reconciliation, not at closeout
One
Command center for the whole build
Capabilities

Every tool the job
actually demands.

Six integrated capabilities covering the full lifecycle of every project I run — fiber, telecom, and IoT builds. No third-party integrations, no data silos, one command center.

01 — Assistant
Every Project Detail, On Demand
Ask anything about a live project and get an answer grounded in its real data — schedule, risks, money, and open actions. Built around the work I actually run: TxDOT permits, Oncor make-ready, HDD bore rates, GPON splicing, HFC node-split sequencing, 5G site acquisition, and IoT connectivity.
Scope
Full project data
Answers
Schedule · risk · money
Domains
Fiber · Telecom · IoT
02 — Alert Engine
Continuous Portfolio Intelligence
15+ automated rules run across every project at once. They watch go-live pressure, permit overruns, splice and placement pace, 811 locate windows, contractor performance, and budget burn rate. Issues surface before they become failures.
Rules
15+ automated
Coverage
All projects at once
Levels
Critical · High · Medium
03 — Location Tracker
Every Passing, Start to Finish
Track every service address from identified through completed and verified. A live address database and construction log across the whole build, with milestone alerts as each stage clears. Adapts to FTTH, HFC, 5G, and OSP routes.
Workflow
Identified → Verified
View
Live address log
Types
FTTH · HFC · 5G · OSP
04 — Field Log
The Field, Captured on the Spot
Log job-site photos and notes from any mobile browser — progress, hazards, quality issues, and equipment conditions, tied to the task and location they belong to. The field record and the project record stay in sync, no double entry.
Capture
Photos · notes
Linked to
Task & location
Access
Mobile · no app
05 — Report Engine
Professional Output in One Click
8 report types from live project data delivered as branded Word documents. Weekly Status, Executive Summary, RAID Log, FTTH Network Status, Vendor & Permit Status, Field Activity, Change Order Summary, and Project Closeout — all built from your actual data.
Types
8 formats
Format
Branded Word docs
Source
Live project data
06 — Finance Module
Budget Control for Infrastructure
Apply estimator output as budget baseline. Track actual task costs. Manage change orders with approval workflow and auto budget impact. Burn rate and CO velocity alerts flag financial risk early. Three-tab Excel workbook export. East Texas market rate benchmarks built in.
Alerts
Burn rate · CO velocity
Export
3-tab Excel workbook
Data
Real data only
Technologies

Every technology in the stack.
Every phase.

Industry-specific templates auto-load on project creation — task libraries, document types, alert rules, and field log fields for each build type, spanning fiber, telecom, IoT, IT infrastructure, and software. No configuration required.

🔵
FTTH / GPON
Full-lifecycle management from engineering survey through ONT activation and NOC handoff.
Oncor MRTxDOTOTDRONT
📡
HFC / Node Split
Node segmentation planning, activation sequencing, and RF signal quality documentation.
RF QualityNode SegHSD
🔌
IoT Connectivity
Enterprise connectivity deployments — APN/VPN provisioning, global roaming, SLA governance.
APN/VPNSLARoaming
🔧
Fiber Trenching & HDD
811 locate management, bore progress tracking, pavement restoration, permit inspection closeout.
811 LocateHDD LogBore Progress
📶
5G / Wireless
Site acquisition, FAA clearance, zoning, structural analysis, and RF design tracking.
Site AcqFAARF DesignZoning
🛣️
OSP / Middle Mile
Route-level tracking, segment status, ROW management, and as-built documentation.
ROWRoute SegAs-Builts
Intelligence Pipeline

Raw data in.
Clear signal out.

Everything on your project flows through one structured pipeline — from raw field inputs, into the command engine, and out to client-ready deliverables.

📋
Field Input
Notes · Photos · Docs · RFPs
Structured Intake
Risks · Actions · Permits · Costs
Command Engine
Dashboard · Finance · Portfolio
🔔
Alert System
15+ rules · Go-live · Permits · Budget
📄
Deliverables
Reports · Excel · Status · Closeout
Working Together

From first call
to full control.

No long onboarding, no software to buy. You bring the project, I bring the command center, and you start seeing the truth of your build in the first week.

STEP 01
The call
Twenty minutes. You walk me through the build and where it hurts. I tell you honestly whether I can help and how I'd approach it.
STEP 02
Stand up the command center
I load your project — scope, schedule, permits, vendors, and money — into the system I run every engagement on. Your whole build in one place, fast.
STEP 03
The weekly briefing
Every week you get a clear read: what moved, what slipped, where the money stands, and the one thing that needs you next. Delivered client-ready.
Who I Work With

The work is scaling.
The controls aren't.

Fiber
FTTH · OSP · HFC
Telecom
5G · backhaul · middle mile
IoT
APN/VPN · SLA governance
SaaS
Operations support
General Contractors & Subs
Crews mobilized, permits pending, pay apps drifting from production — tracked across disconnected spreadsheets. The gaps between them are where margin and schedule quietly disappear.
ISPs & Operators
Multiple concurrent builds, each with its own permits, vendors, and money. You need one place to see which project needs you today — and what to do about it.
Owners Without a PMO
Running a serious build without a project office means living in status calls and hoping nothing slips. I bring the office with me, stood up on day one.
Why It Matters
Most project management is a person, a spreadsheet, and hope. I close the gap between the plan and the field, and you can see it happening the whole way.
Contact

Let's talk about
your project.

Book a 20-minute call. Bring your messiest build — fiber, telecom, or IoT — and I'll tell you honestly whether I can help and how I'd approach it. Fractional delivery, PMO advisory, or project recovery. Pricing is scoped to each project and engagement, quoted after the call.

Send a Message
Response within one business day · Pricing scoped per project
✓   Message received. We'll be in touch within one business day.

The command layer
your builds
have been missing.

An operator who's done the work, running your project on a system built to catch what slips. Book a 20-minute call and bring me your hardest build — fiber, telecom, or IoT.

$8B+
TX Broadband
800+
Subgrantees
Zero
Existing Tools
Live
Platform Status