AI Project Intelligence  ·  Built for Telecom

The command layer
telecom infrastructure
has always needed.

VPG Mission Control is the AI-powered project management platform for every fiber and telecom build — FTTH, HFC, 5G, BEAD, OSP. From the first permit to the final closeout, one command center.

FTTH/GPON HFC/Node Split 5G Backhaul BEAD OSP/Middle Mile Fiber Trenching
VPG Mission Control — Cherokee County FTTH Phase 2
LIVE
Cherokee Co. FTTH
FTTH/GPON · Engineering
Projects
Cherokee FTTH P2
Anderson HFC Split
Smith Co. BEAD
Rusk OSP Route 7
Health
 2 On Track
 1 At Risk
 1 Critical
Health Score
74
↓ from 82
Active Risks
3
2 critical
Open Actions
8
3 overdue
Go-Live
42d
Jun 5
CriticalTxDOT permit FM 1234 — 14 days past deadline
HighBEAD certification — 39% with 42d to go-live
ResolvedOncor make-ready Zone 2 complete
AI Agent
"Escalate TxDOT FM 1234 to District Utility Coordinator today. 14-day delay creates direct go-live exposure. Accelerate BEAD certification to 80 locations per week."
Project Completion72%
Active Tasks — Cherokee Co. FTTH Phase 2
18 open · 3 overdue · 7 completed this week
TxDOT Encroachment Permit — FM 1234
Submitted Apr 4 · 14 days overdue · Owner: PM Keenan
OVERDUE
811 Utility Locate — Section 4 FM 1234
Due Apr 28 · Pending clearance
BLOCKED
BEAD Location Certification — Zone 3 (487 of 1,240)
In progress · Due May 15 · 39% complete
IN PROGRESS
Oncor Make-Ready — Zone 2 Aerial Complete
Completed Apr 18 · Strand authorized · 2.4 miles
COMPLETE
HDD Bore — Hwy 69 Crossing (320ft)
In progress · Due Apr 30 · Bore crew on site
IN PROGRESS
Contract
$4.2M
Spent
$2.8M
Remaining
$1.4M
Change Orders
+$142K
Budget vs Spend by Category
Aerial/Strand
$820K / $1.0M
Underground
$650K / $1.0M
Electronics
$910K / $1.0M
Make-Ready
$308K / $700K
Permitting
$76K / $200K
Recent Change Orders
CO-007  HDD rock encountered — Hwy 69+$48,000
CO-008  Oncor MR scope expansion — Zone 3+$31,200
CO-009  Aerial route optimization credit-$12,500
BEAD Location Tracker — Cherokee County
487 of 1,240 certified · Draw eligible at 100%
284
Identified
312
Surveyed
157
In Progress
487
Certified
Address
Type
Status
Updated
1424 Rusk Hwy, Jacksonville
Residential
Certified
Apr 22
891 County Rd 413, Alto
Residential
In Progress
Apr 24
2201 S Jackson St
Business
Surveyed
Apr 19
FM 2138 Mile Marker 4.2
Anchor
Certified
Apr 21
What's our biggest risk to the June 5 go-live?
The TxDOT encroachment permit on FM 1234 is your critical path risk — 14 days past deadline. If unresolved this week it pushes boring 3+ weeks, directly threatening June 5. Escalate to TxDOT District 11 Utility Coordinator immediately. BEAD pace at 39% also needs to reach 80 locations/week.
Generate the weekly status report
Generating Weekly Status Report...|
Ask anything about your project...
FTTH/GPON
Full Build Management
HFC
Node Split Intelligence
5G Backhaul
Site Acquisition Tracking
BEAD
Federal Compliance Engine
OSP
Route & Permit Command
AI Analysis
Real-Time Streaming
15+ Alert Rules
Portfolio-Wide
8 Report Types
One Click
FTTH/GPON
Full Build Management
HFC
Node Split Intelligence
5G Backhaul
Site Acquisition Tracking
BEAD
Federal Compliance Engine
OSP
Route & Permit Command
AI Analysis
Real-Time Streaming
15+ Alert Rules
Portfolio-Wide
8 Report Types
One Click
The Platform

Telecom builds are complex.
Your PM software
should understand that.

Generic project management tools don't know what a TxDOT encroachment permit is. They can't track your BEAD certification pace against a draw request deadline. They've never heard of Davis-Bacon, BABA, or Oncor make-ready.

VPG Mission Control was built from the ground up by a telecom PM who lived this work. Every feature, every alert rule, every report template exists because of a real problem on a real build.

9
Technology templates
15+
Automated alert rules
8
Report types
1
Platform for all of it
Capabilities

Every tool the job
actually demands.

Six integrated capabilities covering the full lifecycle of every telecom infrastructure project. No third-party integrations. No data silos.

01 — AI Agent
Domain-Expert Intelligence
Ask anything about your live project. Deep knowledge of BEAD compliance, TxDOT permits, Davis-Bacon, Oncor make-ready, HDD bore rates, GPON splicing, HFC node split sequencing, and 5G site acquisition. Streams in real time with full project context injected.
Mode
Real-time streaming
Context
Full project injected
Domain
BEAD · TxDOT · HDD
02 — Alert Engine
Continuous Portfolio Intelligence
15+ automated rules run across every project simultaneously — no triggering needed. Monitors go-live pressure, permit overruns, BEAD certification pace, Davis-Bacon gaps, 811 locate requirements, contractor performance, and budget burn rate. Issues surface before they become failures.
Rules
15+ automated
Coverage
All projects at once
Levels
Critical · High · Medium
03 — Location Tracker
Certification to Draw Request
Track every service address from Identified through TDED certification for BEAD draw requests. Adapts for BEAD, FTTH, HFC, 5G, and OSP. Draw request readiness alert fires at 100% certification. Non-BEAD projects use it as an address database and construction log.
Workflow
Identified → Certified
Trigger
100% certification
Types
BEAD · FTTH · HFC · 5G
04 — Field Photo AI
Site Images into Project Intelligence
Upload a job site photo from any mobile browser. Vision AI returns a structured assessment in under 10 seconds: construction progress, safety hazards, quality issues, equipment conditions, and corrective actions. Auto-logged to risk register and field log — no manual entry.
Speed
Under 10 seconds
Output
Risk & action log
Access
Mobile · No app needed
05 — Report Engine
Professional Output in One Click
8 report types from live project data delivered as branded Word documents. Weekly Status, Executive Summary, RAID Log, FTTH Network Status, BEAD Quarterly Progress, Field Activity, Change Order Summary, and Project Closeout — all authored from your actual data.
Types
8 formats
Format
Branded Word docs
Source
Live project data
06 — Finance Module
Budget Control for Infrastructure
Apply estimator output as budget baseline. Track actual task costs. Manage change orders with approval workflow and auto budget impact. Burn rate and CO velocity alerts flag financial risk early. Three-tab Excel workbook export. East Texas market rate benchmarks built in.
Alerts
Burn rate · CO velocity
Export
3-tab Excel workbook
Data
Real data only
Technologies

Every technology in the stack.
Every phase.

Nine technology-specific templates auto-load on project creation — task libraries, document types, alert rules, and field log fields for each build type. No configuration required.

🔵
FTTH / GPON
Full-lifecycle management from engineering survey through ONT activation and NOC handoff.
Oncor MRTxDOTOTDRONT
📡
HFC / Node Split
Node segmentation planning, activation sequencing, and RF signal quality documentation.
RF QualityNode SegHSD
🏛️
BEAD / Federal Grant
Complete federal compliance — Davis-Bacon, BABA, TDED quarterly reports, draw requests.
Davis-BaconBABATDED
🔧
Fiber Trenching & HDD
811 locate management, bore progress tracking, pavement restoration, permit inspection closeout.
811 LocateHDD LogBore Progress
📶
5G / Wireless
Site acquisition, FAA clearance, zoning, structural analysis, and RF design tracking.
Site AcqFAARF DesignZoning
🛣️
OSP / Middle Mile
Route-level tracking, segment status, ROW management, and as-built documentation.
ROWRoute SegAs-Builts
Intelligence Pipeline

Raw data in.
Clear signal out.

Everything that enters VPG Mission Control flows through a structured intelligence pipeline — from raw field inputs through AI extraction into the command engine and out to client-ready deliverables.

📋
Field Input
Notes · Photos · Docs · RFPs
AI Extraction
Risks · Actions · Permits · Costs
Command Engine
Dashboard · Finance · Portfolio
🔔
Alert System
15+ rules · Go-live · BEAD · Budget
📄
Deliverables
Reports · Excel · TDED · Draw requests
The Market

$42 billion deploying now.
Zero purpose-built PM tools.

$3.3B
Texas BEAD Approved
800+
TX Subgrantees
4yr
Build Window
Zero
Existing Solutions
BEAD Subgrantees
Every BEAD award recipient faces mandatory quarterly TDED reporting, location certification, and Davis-Bacon documentation. Manual processes create direct clawback exposure at every milestone.
OSP Contractors
OSP firms managing concurrent fiber builds need real-time portfolio visibility, change order control, and client reporting. No dedicated solution has existed until now.
Rural Telephone Cooperatives
Co-ops face identical federal compliance requirements with smaller teams. VPG Mission Control scales to any team size without additional infrastructure cost.
The Opportunity
$42.45 billion in federal broadband infrastructure is deploying into a market where the PM software is a spreadsheet. The window is open. The platform is live.
Contact

Request a
demonstration.

Schedule a 20-minute live demonstration on a real East Texas fiber project. See AI analysis, BEAD tracking, alert performance, and report generation with actual project data. Pricing discussed on the demo.

Send a Message
Response within one business day · Pricing discussed on demo
✓   Message received. We'll be in touch within one business day.

The command layer
your builds
have been missing.

VPG Mission Control is live and ready. Request a 20-minute demonstration — real AI analysis, real alerts, real reports on an active East Texas fiber project.

$3.3B
TX BEAD Active
800+
Subgrantees
Zero
Existing Tools
Live
Platform Status