AI Project Intelligence  ·  Built for Telecom

The command layer telecom infrastructure has always needed.

VPG Mission Control is the AI-powered project management platform for every fiber and telecom build — FTTH, HFC, 5G, BEAD, OSP. From the first permit to the final closeout, one command center.

FTTH / GPON HFC / Node Split 5G Backhaul BEAD OSP / Middle Mile Fiber Trenching
VPG Mission Control — Portfolio Overview
LIVE
Cherokee Co. FTTH
FTTH/GPON · Engineering
Projects
Cherokee FTTH P2
Anderson HFC Split
Smith Co. BEAD
Rusk OSP Route 7
Portfolio Health
2 On Track
1 At Risk
1 Critical
Health Score
74
↓ from 82
Active Risks
3
2 critical
Open Actions
8
3 overdue
Go-Live
42d
Jun 5
CriticalTxDOT permit FM 1234 — 14 days past deadline
HighBEAD certification — 39% with 42d to go-live
ResolvedOncor make-ready Zone 2 complete
AI Agent
"Escalate TxDOT FM 1234 to District Utility Coordinator today. 14-day delay creates direct go-live exposure."
Project Completion72%
Active Tasks — Cherokee Co. FTTH Phase 2
18 open · 3 overdue · 7 completed this week
TxDOT Encroachment Permit — FM 1234
Submitted Apr 4 · 14 days overdue · Owner: PM Keenan
OVERDUE
811 Utility Locate — Section 4 FM 1234
Due Apr 28 · Pending clearance · Owner: Field Super
BLOCKED
BEAD Location Certification — Zone 3 (487 of 1,240)
In progress · Due May 15 · 39% complete
IN PROGRESS
Oncor Make-Ready — Zone 2 Aerial Complete
Completed Apr 18 · Strand authorized · 2.4 miles
COMPLETE
HDD Bore — Hwy 69 Crossing (320ft)
In progress · Due Apr 30 · Bore crew on site
IN PROGRESS
Contract Value
$4.2M
Spent to Date
$2.8M
Remaining Budget
$1.4M
Change Orders
+$142K
Budget vs Spend by Category
Aerial/Strand
$820K / $1.0M
Underground
$650K / $1.0M
Electronics
$910K / $1.0M
Make-Ready
$308K / $700K
Permitting
$76K / $200K
Recent Change Orders
CO-007  Additional HDD rock encountered — Hwy 69+$48,000
CO-008  Oncor MR scope expansion — Zone 3+$31,200
CO-009  Aerial route optimization — credit-$12,500
BEAD Location Tracker — Cherokee County
487 of 1,240 certified  ·  Draw eligible at 100%
284
Identified
312
Surveyed
157
In Progress
487
Certified
Address
Type
Status
Updated
1424 Rusk Highway, Jacksonville
Residential
Certified
Apr 22
891 County Rd 413, Alto
Residential
In Progress
Apr 24
2201 S Jackson St, Jacksonville
Business
Surveyed
Apr 19
FM 2138 Mile Marker 4.2
Anchor
Certified
Apr 21
What's our biggest risk to hitting the June 5 go-live?
The TxDOT encroachment permit on FM 1234 is your critical path risk. At 14 days past submission deadline, if not resolved this week it pushes your bore schedule by 3+ weeks — directly threatening June 5. Escalate to TxDOT District 11 Utility Coordinator immediately. Secondary risk: BEAD certification pace. At 39% with 42 days remaining you need 80 locations per week — currently running 55. Consider dedicating a second field team to Zone 3 certification.
Generate the weekly status report
Generating Weekly Status Report from live project data|
Ask anything about your project...
FTTH/GPON
Full Build Management
HFC
Node Split Intelligence
5G Backhaul
Site Acquisition Tracking
BEAD
Federal Compliance Engine
OSP
Route & Permit Command
AI Analysis
Real-Time Streaming
15+ Alert Rules
Portfolio-Wide
8 Report Types
One Click
FTTH/GPON
Full Build Management
HFC
Node Split Intelligence
5G Backhaul
Site Acquisition Tracking
BEAD
Federal Compliance Engine
OSP
Route & Permit Command
AI Analysis
Real-Time Streaming
15+ Alert Rules
Portfolio-Wide
8 Report Types
One Click
The Platform

Telecom builds are complex.
Your PM software
should understand that.

Generic project management tools don't know what a TxDOT encroachment permit is. They can't track your BEAD certification pace against a draw request deadline. They've never heard of Davis-Bacon, BABA, or Oncor make-ready.

VPG Mission Control was built from the ground up by a telecom PM who lived this work. Every feature, every alert rule, every report template exists because of a real problem on a real build.

9
Technology templates
15+
Automated alert rules
8
Report types
1
Platform for all of it
Capabilities

Every tool the job
actually demands.

Six integrated capabilities covering the full lifecycle of every telecom infrastructure project — from engineering kickoff through federal closeout. No third-party integrations required. No data silos.

01 — AI Agent
Domain-Expert Intelligence
Ask anything about your live project and receive expert analysis grounded in your actual project data. The AI Agent has deep knowledge of BEAD compliance, TxDOT encroachment permits, Davis-Bacon prevailing wage, Oncor and AEP make-ready, HDD bore rates for East Texas, GPON splicing standards, node split sequencing for HFC, and 5G small cell site acquisition. Every response streams in real time with full project context automatically injected.
Response Mode
Real-time streaming
Context
Full project data injected
Domain
BEAD · TxDOT · HDD · HFC · 5G
Technologies

Every technology in the stack.
Every phase.

Nine technology-specific templates auto-load on project creation — task libraries, document types, alert rules, and field log fields appropriate for each build type. No configuration required.

🔵
FTTH / GPON
Full-lifecycle management from engineering survey through ONT activation and NOC handoff.
Oncor MRTxDOTOTDRONT
📡
HFC / Node Split
Node segmentation planning, activation sequencing, and RF signal quality documentation.
RF QualityNode SegHSD
🏛️
BEAD / Federal Grant
Complete federal compliance engine — Davis-Bacon, BABA, TDED quarterly reports, draw requests.
Davis-BaconBABATDED
🔧
Fiber Trenching & HDD
811 locate management, bore progress tracking, pavement restoration, and permit inspection closeout.
811 LocateHDD LogBore Progress
📶
5G / Wireless
Site acquisition, FAA clearance, zoning, structural analysis, and RF design tracking.
Site AcqFAARF DesignZoning
🛣️
OSP / Middle Mile
Route-level construction tracking, segment status, ROW management, and as-built documentation.
ROWRoute SegAs-Builts
Intelligence Pipeline

Raw data in.
Clear signal out.

Everything that enters VPG Mission Control flows through a structured intelligence pipeline — from raw field inputs through AI extraction into the command engine and out to client-ready deliverables.

📋
Field Input
Notes · Photos · Docs · RFPs
AI Extraction
Risks · Actions · Permits · Costs
Command Engine
Dashboard · Finance · Portfolio
🔔
Alert System
15+ rules · Go-live · BEAD · Budget
📄
Deliverables
Reports · Excel · TDED · Draw requests
The Market

$42 billion deploying now.
Zero purpose-built
PM tools.

$3.3B
Texas BEAD Approved
800+
TX Subgrantees
4yr
Build Window
Zero
Existing Solutions
BEAD Subgrantees
Every BEAD award recipient faces mandatory quarterly TDED reporting, location certification, and Davis-Bacon documentation. Manual processes create direct clawback exposure at every milestone.
OSP Contractors
OSP firms managing concurrent fiber builds need real-time portfolio visibility, change order control, and client reporting infrastructure. No dedicated solution has existed until now.
Rural Telephone Cooperatives
Co-ops face identical federal compliance requirements with smaller teams. VPG Mission Control scales to any team size without additional infrastructure cost.
The Opportunity
$42.45 billion in federal broadband infrastructure is deploying into a market where the PM software is a spreadsheet. The window is open. The platform is live.
Contact

Request a
demonstration.

Schedule a 20-minute live demonstration on a real East Texas fiber project. See AI analysis, BEAD tracking, alert engine performance, and professional report generation with actual project data. Pricing is discussed during the demo based on your operation size.

Send a Message
Response within one business day · [email protected]
✓   Message received. We'll be in touch within one business day.

The command layer
your builds
have been missing.

VPG Mission Control is live and ready. Request a 20-minute demonstration — see real AI analysis, real alert intelligence, and real reports generated on an active East Texas fiber project.

$3.3B
TX BEAD Active
800+
Subgrantees
Zero
Existing Tools
Live
Platform Status